Installation information for ER-UPB housing

(also Requirements in line with approval and approval)

ER-UPB are equipped with fire protection cover and metal shut-off shutter with release mechanism.

Wall installation is described below. Ceiling installation should be undertaken following the description for wall installation.

Housings can be installed with an air outlet direction (exhaust socket) upwards, to the right or left. With an upwards air outlet direction, the yoke spring should be removed from the shut-off device.

Suitable mounting material is to be provided by the customer. To screw down the connection duct use steel screws, if screwing into brickwork/concrete use steel dowels.

The metal shut-off device should be prepared according to these instructions.

A second room connection is only permitted with ER-UPB/R, ER-UPB/L or ER-UPB/U.